The Campus |
|
|
|
Size |
668,588 sf in 5 Buildings |
|
|
|
Acres |
67 acres |
|
|
|
Ownership |
Brookfield Asset Management |
|
|
|
Power Capacity |
14 MVA |
|
|
|
Security |
2 Gates with 24 Hour Access |
|
|
|
Fiber Carriers On-Site |
Verizon/Verizon Business, AboveNet, AT&T and RCN |
|
|
|
Telephone Carrier |
Verizon |
|
|
|
Type |
Offers and |
|
|
|
Power House |
|
|
|
(2) 16 MVA Transformers |
|
|
|
(2) 2.5 MW Turbine Generators |
|
|
|
(2) 5.0 MW Turbine Generators |
|
|
|
(2) 20,000 gallon buried storage tanks |
|
|
|
(2) 500 gallon day tanks |
|
|
|
100 Convergence Way (Building A) |
|
|
|
White Space |
9,300 sf - First Floor
10,000 sf - Second Floor |
|
|
|
Power |
50 watts sf |
|
|
|
Power Distribution |
(2) 2,500 kVA Transformers |
|
|
|
Slab to Slab Height |
11'-0" |
|
|
|
Rasied Floor Height |
12" |
|
|
|
Floor Live Load |
<100 psf |
|
|
|
Cooling Capacity |
300 tons |
|
|
|
Available Space |
click for available space |
|
|
|
100 Convergence Way (Building B) |
|
|
|
White Space |
17,800 sf - Basement Floor
15,580 sf - First Floor
5,100 sf - Second Floor |
|
|
|
Power Distribution |
(2) 2,500 kVA Transformers |
|
|
|
Slab to Slab Height |
11'-0" |
|
|
|
Rasied Floor Height |
12" |
|
|
|
Floor Live Load |
<100 psf |
|
|
|
Cooling Capacity |
300 tons |
|
|
|
Available Space |
click for available space |
|
|
|
200 Convergence Way |
|
|
|
White Space |
1,145 sf - Third Floor |
|
|
|
Power |
50 watts |
|
|
|
Power Distribution |
(1) 2,500 kVA Transformer |
|
|
|
Slab to Slab Height |
12'-0" |
|
|
|
Rasied Floor Height |
8" |
|
|
|
Floor Live Load |
80 psf |
|
|
|
Cooling Capacity |
300 tons |
|
|
|
Available Space |
click for available space |
|
|
|
300 Convergence Way |
|
|
|
White Space |
13,850 sf - Basement Floor
18,450 sf - Second Floor |
|
|
|
Power |
50 watts - Basement Floor
50 watts sf of IT load- Second Floor |
|
|
|
Power Distribution |
(2) 2,500 transformer |
|
|
|
Slab to Slab Height |
12'-0" |
|
|
|
Rasied Floor Height |
15" |
|
|
|
Floor Live Load |
>125 psf |
|
|
|
Cooling Capacity |
(2) 300 tons chillers |
|
|
|
Redundancies |
2N on all critical systems except primary power |
|
|
|
Available Space |
click for available space |
|
|
|
400 Convergence Way |
|
|
|
White Space |
None |
|
|
|
Power Distribution |
Power to be brough to site as needed |
|
|
|
Slab to Slab Height |
12'-0" |
|
|
|
Floor Live Load |
125 psf |
|
|
|
|
Available Space |
click for available space |
|